CompTIA A+ Roadmap: 12-Week Plan for Core 1 and 2

9 min read ยท 2026-11-01

A practical comptia a+ roadmap takes about 12 weeks at 8 to 10 hours of study a week. You spend six weeks on Core 1 (220-1201) and sit it, then six weeks on Core 2 (220-1202) and sit that one. You earn the certification only when you pass both exams, and CompTIA lets you take them in any order.

The plan is for career changers, students and help desk staff whose manager wants a plan with dates. Each phase has a goal, steps you can actually do and a milestone you can check. Before each exam, you make a go or no-go decision: at the end of week 5 for Core 1 and at the end of week 11 for Core 2. If you already work in IT support, spend less time on the content weeks and use the extra time for practice tests.

The roadmap at a glance

Goal: Pass CompTIA A+ Core 1 (220-1201) and Core 2 (220-1202) and earn the certification. Duration: 12 weeks, about 8 to 10 hours per week

  1. Baseline and setup (Week 1)

    Find out what you already know and get your tools ready before you start on the content.

    • Download the official exam objectives for both exams from CompTIA and turn them into two checklists.
    • Take one full practice test for Core 1 without studying, so you know where you start.
    • Pick one main video course and one study guide written for the 1201 and 1202 series, and stick to them.
    • Set up a lab: an old PC or laptop you can open, plus a free virtual machine tool for installing operating systems.

    Milestone: You have a baseline score, a working lab and a weekly study calendar.

  2. Core 1: Hardware and mobile devices (Weeks 2 to 3)

    Learn the physical side of computers and phones. Every troubleshooting question builds on it.

    • Study motherboards, CPUs, RAM types, storage (HDD, SSD, NVMe) and power supplies.
    • Open your lab PC, take out and reseat the RAM and a drive, then boot it again.
    • Cover printers, display types, and cable and connector types.
    • Learn mobile device parts and accessories, and set up email and syncing on a phone.

    Milestone: You can name every port and connector in your flash card deck and score 80% or more on a hardware quiz.

  3. Core 1: Networking, cloud and troubleshooting (Weeks 4 to 5)

    Understand how devices connect and how to fix them when they don't.

    • Book your Core 1 exam for the end of week 6, so you have a fixed date to work toward.
    • Learn TCP and UDP ports, IPv4 and IPv6 basics, DHCP, DNS and common Wi-Fi standards.
    • Set up a home router from its admin page and change the Wi-Fi settings yourself.
    • Study virtualization and cloud models (IaaS, PaaS, SaaS, public, private, hybrid).
    • Learn the CompTIA troubleshooting method by heart and apply it to hardware and network scenarios.
    • Take a full timed Core 1 practice test at the end of week 5 and make the Core 1 go or no-go decision (see the budget section below).

    Milestone: You can write the port list from memory, explain the six troubleshooting steps in order, and you have decided to keep or move your Core 1 date.

  4. Core 1 review and exam (Week 6)

    Close your gaps and sit the first exam while the content is fresh.

    • If you moved the date, repeat this review week until your scores hold, then book again.
    • Take two timed practice tests and sort every wrong answer by domain.
    • Go back to your objectives checklist and review only the weak lines.
    • Practice performance-based questions, where you drag, match or configure something.
    • Sit Core 1 at the end of the week.

    Milestone: Core 1 passed, with a score of at least 675 on a scale of 900.

  5. Core 2: Operating systems and security (Weeks 7 to 9)

    Master the two domains that carry the most weight in Core 2.

    • Install Windows in a virtual machine and use Settings, Control Panel, Task Manager, Disk Management and the command line.
    • Learn the basics of macOS and Linux: file systems, common commands and system tools.
    • Study malware types, social engineering, authentication, wireless security and how to secure a workstation.
    • Practice user accounts, permissions and BitLocker in your lab.

    Milestone: You can run ipconfig, ping, sfc, chkdsk and gpupdate and explain what each one does.

  6. Core 2: Software troubleshooting and procedures (Weeks 10 to 11)

    Learn how a support technician works day to day.

    • Book your Core 2 exam for the end of week 12.
    • Troubleshoot common Windows, mobile app and security problems with the scenarios in your study guide.
    • Study documentation, change management, backups, safety, environmental rules and professional communication.
    • Learn basic scripting file types and remote access tools.
    • Take one full timed Core 2 practice test at the end of week 11 and make the Core 2 go or no-go decision.

    Milestone: You reach your target score on a full Core 2 practice test and you have decided to keep or move your Core 2 date.

  7. Core 2 review and exam (Week 12)

    Finish strong and earn the certification.

    • If you moved the date, repeat this review week until your scores hold, then book again.
    • Take one more timed practice test and review every wrong answer.
    • Redo the performance-based questions you struggled with.
    • Rest the day before the exam.
    • Sit Core 2.

    Milestone: Core 2 passed, with a score of at least 700 on a scale of 900, and CompTIA A+ earned.

Core 1 and Core 2: codes, domains and scores

A+ is made of two exams. Core 1 (220-1201) covers hardware and networking. Core 2 (220-1202) covers operating systems and security. Core 1 has up to 90 questions in 90 minutes and needs 675 out of 900 to pass. Core 2 needs 700 out of 900. Both mix multiple choice, drag-and-drop and performance-based questions.

The domain weights show you where to spend your hours. Troubleshooting is the largest part of Core 1, so the plan comes back to it in weeks 4, 5 and 6. In Core 2, operating systems and security share the top spot, so they get three full weeks.

If your book or course mentions 220-1101 or 220-1102, it covers the previous series. Use material written for 1201 and 1202, and take both exams from the same series.

  • Core 1: Hardware and network troubleshooting (28%), Hardware (25%), Networking (23%), Mobile devices (13%), Virtualization and cloud computing (11%)
  • Core 2: Operating systems (28%), Security (28%), Software troubleshooting (23%), Operational procedures (21%)

Core 1 or Core 2 first?

This comptia a+ study plan starts with Core 1 because hardware and networking give you the words Core 2 uses. It is hard to fix a Wi-Fi problem in Windows if you don't know what DHCP does. Passing Core 1 in week 6 also gives you an early win and real exam experience: you see what performance-based questions look like, how the timer feels and how to flag a question for later.

The reverse order makes sense if you use Windows all day but have never opened a PC case. Whichever order you choose, keep the gap between the two exams short so you don't forget the format or lose your rhythm.

Is A+ the right first step for you?

CompTIA recommends about 12 months of experience in help desk, desktop support or field technician work. That is a recommendation, not a requirement. Use this quick grid to decide how to run the plan.

  • No IT experience: follow all 12 weeks and give extra time to lab work in every phase.
  • Some home tech experience: keep the 12 weeks but move faster through hardware if your quiz scores are already high.
  • Already in help desk or desktop support: compress the plan to 6 to 8 weeks and spend most of it on practice tests.
  • Already in networking or security work: A+ may add little to your profile. Check whether your employer or the job ads you target actually ask for it.

Budget and schedule to show your manager

If your employer pays or gives you study time, present the plan like any work project: two exam dates, the hours per week and a clear cost list. Check current voucher prices on the CompTIA store, and ask whether your employer or school has access to discounted vouchers.

The go or no-go check is simple. At the end of week 5, and again at the end of week 11, look at your last two timed practice tests. Move your exam date if they are not steady at your target, or if one domain is still clearly behind the others. Moving a date costs less than a retake, and you still have the review week to close the gap.

  • Two exam vouchers, one for Core 1 and one for Core 2
  • A possible retake, kept as a contingency line
  • One study guide and one video course
  • A practice test bank
  • Lab hardware: an old PC, a spare drive, RAM sticks
  • Study hours per week, and whether they happen during work time
  • Go or no-go decisions at the end of week 5 (Core 1) and the end of week 11 (Core 2), before the last review week

How to split your weekly hours

The mix matters more than the total. Videos feel productive, but the exam asks you to do things and recall them under time pressure. Spread your hours over five or six short sessions rather than one long weekend block, so ports, commands and acronyms stay in memory.

  • 3 hours of video or reading on the week's objectives
  • 2 to 3 hours of hands-on lab work
  • 2 hours of flash cards and short quizzes
  • 1 to 2 hours of timed practice questions

Practice tests and performance-based questions

Treat a practice test as a diagnostic tool. After each one, write down every wrong answer and the objective it belongs to, then review the objective, not just the question. Memorizing answers raises your score on that test, not on the real exam. Keep full timed tests for the decision points and the review weeks, and use short quizzes by domain before that.

Performance-based questions reward lab time. Break your virtual machine on purpose: change a network setting, create a user with the wrong permissions, then fix it with the troubleshooting method. Do a few of these questions every week from week 4 on.

What comes after A+: the CompTIA certification roadmap

A+ is the entry point of a longer path. Most people move on to Network+ (N10-009), then Security+ (SY0-701). From there you can specialize: Linux+ (XK0-006) or Cloud+ for systems work, CySA+ (CS0-004) or PenTest+ (PT0-003) for security, and SecurityX (CAS-005) at the advanced level.

Pick the next step from the job you want, not from the list. Help desk and desktop support roles often stop at A+ for a while. Network or system admin roles lean on Network+, and security roles on Security+. A useful bonus: according to CompTIA's continuing education pages, passing Network+ or Security+ fully renews your A+.

Common mistakes to avoid

  • Studying only from videos, so swap one video hour a week for lab work and recall practice.
  • Leaving ports and commands for the last week, when flash cards from week 2 and a daily review fix it.
  • Skipping performance-based questions until exam day, instead of doing a few every week from week 4.
  • Keeping the exam date after one lucky score, when the go or no-go decision should rest on two steady timed tests.
  • Waiting months between Core 1 and Core 2, which you avoid by booking Core 2 in week 10.
  • Treating operational procedures as easy, although they count for 21% of Core 2 and deserve a full review.

Frequently asked questions

How long does it take to study for CompTIA A+?

Plan for about 12 weeks at 8 to 10 hours a week for both exams. If you already work in IT support, 6 to 8 weeks can be enough. With only a few hours a week, stretch the plan to 16 to 20 weeks and keep the same order of phases.

Do I have to pass both Core 1 and Core 2?

Yes. You earn CompTIA A+ only after passing both exams, taken from the same series. Passing one exam alone does not give you the certification.

What is the passing score for CompTIA A+?

Core 1 (220-1201) needs 675 and Core 2 (220-1202) needs 700, both on a scale of 900. The score is scaled, so it is not a simple percentage of correct answers.

Can I pass CompTIA A+ with no IT experience?

Yes. The recommended 12 months of experience is advice, not a condition to sit the exam. Without experience, give more time to the lab work in each phase.

Does CompTIA A+ expire?

Yes, it stays valid for three years. According to CompTIA, you renew it by earning 20 continuing education units within that three-year cycle. Passing a higher CompTIA certification such as Network+ or Security+ also fully renews it.