ICE Confidence Score: How to Rate It (1 to 10)
9 min read · 2026-10-27
The ICE confidence score is the C in ICE. It is a 1 to 10 rating of how sure you are that an idea will deliver the impact you gave it. It should come from evidence, like user feedback, test results or real data, and not from how much the team likes the idea. Confidence keeps Impact honest: a big promise with no proof should rank below a smaller promise that has proof.
The ICE scoring model ranks ideas on Impact, Confidence and Ease. It is often credited to Sean Ellis and is common in product and growth marketing. Most teams find Impact and Ease easy to score. Confidence is where scores get inflated. This guide gives you a confidence scale based on evidence, a worked example where the ranking changes once the evidence is checked, and a 4-week plan to make ICE part of how your team builds its roadmap.
The roadmap at a glance
Goal: Replace gut-feel confidence with evidence-based ICE scores and turn the ranked ideas into a roadmap you can defend. Duration: 4 weeks
Write the Confidence Scale (Week 1, days 1 to 2)
Agree on what each Confidence score means before anyone scores.
- Pick the one metric the ideas should move this quarter, such as activation or retention.
- Write a 1 to 10 confidence scale where each level matches a type of evidence.
- Define Impact and Ease at scores 1, 5 and 10 so all three letters use the same logic.
- Decide to multiply the three scores, and write that down.
Milestone: A one-page scoring guide that the whole team has read.
Collect Evidence for Each Idea (Week 1, days 3 to 5)
Attach proof to every idea before it gets a number.
- List each idea in one sentence: what changes and for whom.
- Next to each idea, note what you already know: support tickets, sales notes, interviews, past tests, usage data.
- Mark ideas with no evidence at all as "opinion only".
- Remove duplicates and merge ideas that solve the same problem.
Milestone: Every idea has an evidence note, even if the note says "none".
Score Alone, Then Calibrate (Week 2)
Get honest scores that do not depend on the loudest voice.
- Have two or three people score each idea on their own.
- Put all scores side by side in a shared sheet.
- Discuss only the ideas where Confidence differs by 3 points or more.
- Settle each gap by pointing to the evidence on the scale, not by debate.
Milestone: A ranked list where every Confidence score names its evidence.
Test the Promising Unknowns (Weeks 2 to 3)
Raise or lower confidence on high-impact ideas that have weak proof.
- Pick the two or three ideas with high Impact and Confidence of 4 or less.
- Choose one cheap check for each: five user interviews, a clickable prototype or a fake door button.
- Set a clear pass rule before the check starts.
- Record the result next to the idea.
Milestone: Each tested idea has a new Confidence score and a written result.
Rescore and Build the Roadmap (Week 3)
Turn the final ranking into phases and milestones.
- Recalculate ICE scores with the updated Confidence.
- Check the top ideas for dependencies, legal limits and team capacity.
- Place the chosen ideas into phases on the roadmap.
- Keep the score and the evidence note on each roadmap item.
Milestone: A roadmap draft where every item shows its ICE score.
Present and Keep It Fresh (Week 4 and ongoing)
Make the decision visible and update it when you learn something.
- Present the roadmap with the scoring guide attached.
- Set a rescoring date, such as after each release or once a month.
- Update Confidence as soon as a test result or new data arrives.
Milestone: A shared roadmap and a date in the calendar for the next rescoring.
What the ICE Confidence Score Means
Each ICE letter answers one question. Impact asks how much the idea will move your target metric if it works. Ease asks how little effort it takes to ship. Confidence asks how sure you are that the Impact score is right.
Most people miss that last point about what the score means. Confidence is not about the idea in general. It is about your Impact estimate. If you score Impact 9 because you hope the idea is big, and you have no proof, Confidence should be low. Multiplying the two pulls the overall score down to match what you actually know. That is why Confidence works as a counterweight to Impact.
A 1 to 10 Confidence Scale Tied to Evidence
Generic scales say "1 means low confidence, 10 means high". That is not enough, because everyone reads "high" differently. A useful ICE scoring system ties each score to a type of proof:
- 1 to 2: Gut feeling only. You or the team think it will work.
- 3: The opinion of a manager, a colleague or an expert.
- 4 to 5: A few customers asked for it, or it comes up in sales and support notes.
- 6: Market research, such as competitor moves or industry reports.
- 7: Interviews with several target users who describe the same problem.
- 8: A test result, like a prototype test, a fake door or a small experiment.
- 9 to 10: Data from a real launch of this idea or of something very close to it.
Where This Confidence Scale Comes From
This scale is inspired by the Confidence Meter from product coach Itamar Gilad, which Savio also covers. It is a simplified version. Gilad's meter uses its own values and gives opinions far less weight than the scale above does, so ideas backed only by opinion sink much harder. If your team tends to overrate ideas, his stricter meter is worth reading. Either way, the rule stays the same: the score depends on the type of proof, not on how excited people are.
How Confidence Changes an ICE Ranking: a Worked Example
The standard formula is ICE score = Impact × Confidence × Ease, with each score from 1 to 10. Here is a team scoring five ideas against its target metric, activation.
First pass, scored on feeling:
- Onboarding checklist: 8 × 8 × 7 = 448
- Shorter signup form: 6 × 6 × 9 = 324
- Welcome email sequence: 5 × 7 × 8 = 280
- In-app video tour: 7 × 7 × 5 = 245
- Chat tool integration: 9 × 6 × 3 = 162
The Same Ideas After Checking the Evidence
Second pass, after checking the evidence against the scale:
- Shorter signup form: user tests showed people quitting at the form, so Confidence goes to 8. Score 6 × 8 × 9 = 432.
- Welcome email sequence: several customer requests plus a past email test, so Confidence stays at 7. Score 280.
- Onboarding checklist: only a manager's opinion, so Confidence drops to 3. Score 8 × 3 × 7 = 168.
- In-app video tour: the team likes it, nothing more, which is a gut feeling, so Confidence drops to 2. Score 7 × 2 × 5 = 70.
- Chat tool integration: pure intuition, so Confidence drops to 2. Score 9 × 2 × 3 = 54.
What the Worked Example Shows
The top idea fell to third place and nobody touched its Impact. The signup form moved to first because it had proof. The checklist is not dead. It is a strong candidate for a quick test, which could bring its Confidence back up.
How to Raise Confidence Before You Commit
A low Confidence score is not a verdict. It tells you what to check next. Before you give weeks of work to a high-impact idea with weak proof, get some evidence cheaply.
- Five user interviews: ask about the problem, not the solution. If most describe the same pain, move toward 7.
- A clickable prototype: watch real users try it. A clear success supports an 8.
- A fake door: add a button or menu item for the feature and count clicks before you build it.
- Past data: look at how a similar change performed before.
Set a Pass Rule Before Each Test
Set the pass rule before the test starts, for example "at least half of the interviewed users name this problem without prompting". Then rescore based on the result, not on how the team feels about it.
ICE vs RICE: Where Confidence Fits
RICE adds a fourth factor, Reach, which is the number of people an idea affects in a set period. RICE also uses Effort instead of Ease, so effort divides the score instead of multiplying it. In RICE as Intercom first described it, Confidence is usually a percentage such as 100%, 80% or 50%, while ICE uses a 1 to 10 score.
Confidence does the same job in both. It discounts the estimate you are least sure about. ICE is faster and suits growth experiments, marketing tests and backlog clean-ups, which is why so many marketing teams use the ICE score. RICE suits product teams where reach varies a lot from one idea to the next.
How to Present ICE Scores to Stakeholders
Leaders rarely question the formula. They question the inputs, and Confidence is the one they push on most. Present each top item with three things: its score, its evidence note and what would change the score.
Show low-confidence, high-impact ideas in a separate "test first" lane. Stakeholders see that their favorite idea is not ignored. It has a clear path to the roadmap.
Useful lines for the meeting:
- "This idea ranks first because we have test results, not because it is the biggest."
- "This one could be huge, but our confidence is 3. We will run interviews in two weeks before committing."
- "If the test passes, it moves into the next phase of the roadmap."
Common mistakes to avoid
- Treating Confidence as enthusiasm, which inflates weak ideas. Fix it by tying every score to a named piece of evidence on your scale.
- Confusing Confidence with Impact, which counts the same hope twice. Fix it by asking "how sure are we about the Impact score" and nothing else.
- Letting one person score alone in a team setting, which hides blind spots. Fix it by having two or three people score separately first.
- Adding the three scores on some ideas and multiplying on others, which breaks the ranking. Fix it by picking multiplication and using it for every idea.
- Scoring once and never again, which leaves stale numbers. Fix it by rescoring after each test result and each release.
- Following the score blindly when strategy or a legal need says otherwise. Fix it by reviewing the top ideas with judgment before you commit.
Frequently asked questions
What is the confidence score in ICE scoring?
It is a 1 to 10 rating of how sure you are that an idea will deliver its Impact score. A high score needs strong proof, such as test results or launch data. A low score means the estimate rests on opinion. It lowers the total ICE score for ideas you cannot back up yet.
Is the ICE score multiplied or added?
The common formula multiplies the three scores, which gives a range of 1 to 1,000. Some teams add or average them instead, but that gives different results and a much narrower spread. When you multiply, a weak Confidence score pulls the total down hard, and that is the point. Pick one method and keep it for every idea.
What is a good ICE score?
There is no universal target, because each team defines its own scale. An ICE score only means something next to other ideas scored by the same team, with the same guide, in the same session. Look at the ranking and the gaps between ideas, not at the raw number.
Who should give the ICE confidence score?
Two or three people who know the evidence, such as a product manager, a designer or a growth lead, plus an engineer for Ease. Each one scores alone first, then the group discusses only the big gaps. The final score should point to the evidence behind it.
How do you stop people from inflating confidence scores?
Use a written scale where each level matches a type of evidence. Ask for the evidence note before you accept any score of 7 or more. If someone cannot name the proof, the score drops to the level of the proof they do have.